Saturday (flooring, day 10)

 

Two of the tilers showed up this morning early to tile the sunroom.

They finished up around noon.

Monday, they'll finish the decorative tile and the wall tile in the shower. Then the grouter can finish the rest of the house. We'll need to meet with the tile boss and our designer to choose a grout for the decorative tile. Baseboards will be delivered for painting on Tuesday. Maybe the vanity can be installed and the mirror? Perhaps the shower enclosure folks will come to measure? The countertop folks will need to come make a template for the quartz countertop. Then maybe the electrician? And then countertop installation. And finally the plumber? I'm thinking mid-December before everything is complete, making this a 3-month project--with two hurricanes in the middle.
Our shower shelf arrived this afternoon. 

I think it's big enough.

It's 5 inches deep and 10 inches wide. The next size is 19 inches wide, which is too big. 

We might add a second 10-inch shelf once we get everything else installed, but I like this smaller size.

We're ready to begin the back bathroom project as soon as we finish the current project.

Sigh, what a mess.

The last of the pink.















1 comment:

  1. Thoroughly enjoyed this blog. You and John have been sooooo patient.

    ReplyDelete

Thursday

  Walked north on the Pinellas Trail this morning Turned around at the bridge overlooking the sound Curlew Creek bridge on the Pinellas Trai...