Tuesday, April 8, 2025

Tuesday

 

Our plumber is scheduled to come Friday to do the plumbing rough-in and to install the tub. We've got all of the bathroom supplies stored in the dining room.

The bathroom is empty and ready.

However, the stuff from the two guest bedrooms are being stored in the sunroom . . .

. . . and in the eat-in kitchen.

We're still able to use all of these rooms, but they are a bit junky looking.

Meanwhile, the guest bedrooms are in various stages of being ready for tiling. We've stored the tile in one bedroom.

The other bedroom has furniture that will be moved out into the house when the flooring is ready to install. We don't yet know when that will be. We were hoping the flooring guys would be able to lay the tile in the two bedrooms before the bathroom is ready, but that is looking doubtful. They might just wait and do it all at once.  In the meantime, we are making everything work. As chaotic as it is, it is so much better than when we were tiling the rest of the house and redoing the primary bath in the midst of two major hurricanes and power outages. 

Today, was a very cool and cloudy day. The high temperature was 68, but the wind was blowing strong at 15 mph, so it felt much colder. We stayed inside mostly. I did rake the front yard this morning before the yard waste pickup people came. I raked in the direction of the wind to make the task manageable. 

We shopped at TJ's and dropped an Amazon return off at Whole Foods.





1 comment:

  1. I know things will be worth the wait when completed.

    ReplyDelete

Thursday

  Walked north on the Pinellas Trail this morning Turned around at the bridge overlooking the sound Curlew Creek bridge on the Pinellas Trai...