Toby continues to heal, thanks to his cone.
The workers came this morning to put up the waterproof boards in the shower. I think this means the tile setters can return.
They patched the towel bar holes.
They started patching some of the old cable and phone outlets that we are removing.
It's a small thing, but the rooms will look nicer without all these outlets.
There's never enough time to complete everything on one trip. These two outlets will have to wait until the next time.
John went grocery shopping this morning while I watched Toby, so I rode my bike to Coachman Park this afternoon to stretch while John supervised Toby and the workers. There were clouds and rain in the distance, but they stayed away, as predicted.
One of the many murals around the library, above the musical stage in the park.
I stopped at Weaver Park in Dunedin to do some pull ups. I noticed that the city is almost finished restoring the playground that was damaged in the September storm. The artificial turf got contaminated due to storm water, so they closed the playground. They're replacing the artificial turf with this black material. It looks like rubber strands. They added a concrete border around the playground to hold the rubber material inside.









Glad Toby is healing. Yeah for waterproofing the shower wall. Learning lots of construction steps to get to the complete job. Onward and upwards.
ReplyDelete