Saturday, November 29, 2025

Saturday

 

We caulked all of the cracks in the stucco on the upper level. Then we rolled primer where we had caulked and removed paint.

John figured out how to position the paint tray on the edge of the gutter to keep his roller fresh and speed up the process.

It was a beautiful day to paint.

It was a perfect 75 degrees once we got started.

We got our stretching exercise.

We primed the corner I spackled yesterday and covered the new stucco where the A/C wall unit used to be one more time.

I put another coat of primer on the stains and where the previous paint had worn thin along the ground and  a few feet up.

The upper portion and lower portion are now in good shape and ready for painting of Swiss Chalet. I think we'll start with the Chantilly Lace trim at the edge of the roof, the attic vent, and window ledges.

1 comment:

  1. I don't think a paint company would have done the expert prep job ya'll have done.

    ReplyDelete

Thursday

  Walked north on the Pinellas Trail this morning Turned around at the bridge overlooking the sound Curlew Creek bridge on the Pinellas Trai...