Today's project entailed putting down mulch in the back bed to keep dirt from splashing up on the new paint when it rains. Here's the bed before the mulch.
Another before picture.
With mulch
I added a bit more mulch to the front beds.
The other project was to prime the last remaining doorway opening repair. It may need to dry overnight before painting.
I also hung the backyard hose holder. A future project is to have a plumber replace all of our hose bibs. This one leaks badly when we turn on the hose.
Looking good.
Chantilly Lace pony wall
I took time to tidy up our workbench. It was piled high with tools.
Getting rid of the mulch and most of the painting supplies helped tidy up the garage.
John washed the car. It spent a lot of time outside during our roofing project and got filthy.
Twilight
70 degrees but 47 at sunrise tomorrow














What is a hose bib? Your mulched beds look great! A huge job itself. Great repair jobs.
ReplyDelete