It was nice to get back to our routine this morning. John jogged, and when he got back, I rode my bike to Coachman Park to stretch. It was in the upper 70s and mostly sunny with a light breeze.
I did some strength training at Weaver Park in Dunedin on the way home.
It was a tough workout after taking Monday off, but I did it.
The workers came this morning to finish the baseboards, except for the bathroom. The bathroom is waiting for the door frames to be installed, which have to go in first before the baseboards.
This hallway has been half way finished since last year, so it's really nice to see baseboards all the way down the hall on both sides.
I still need to fill the nail holes and do touch up painting.
The front bedroom just needed the one long board in the back of the closet. The workers need to put some silicon under the boards in places where there is a gap. It's more noticeable in person. They did the same thing for the living room and primary bedroom.
I spent the afternoon filling in nail holes, sanding, wiping, and painting. Here are the latest pictures, which probably look the same as the above pictures to the casual viewer.
We might remove the contents of this closet and then remove the wire shelves and put the closet Kim and Bruce made for the primary closet in here. That will give us something to do while we wait for the tilers, electrician, plumbers, and carpenters to return.
The workers missed some caulk in the back closet, and I have a few paint smears to clean up.













RE Bathroom door frame ----- are ya'll adding a new door to replace the pocket door? Lots of detail work.
ReplyDelete