Thursday, November 20, 2025

Thursday

 

Today was for cutting in with Swiss Chalet.

We were able to do everything except for the top of the inside tower and ceiling, the top of the outside of the tower, the top of the ceiling where it meets the columns, and the top of the tower where it returns to the house on the outside.

Everything 13 feet and below has one coat of Swiss Chalet.

We noticed that the color is more prominent in the morning, harder to see in direct sunlight like when I took these pictures.

The top needs cutting in.

A morning picture where you can see the color better

Here's another picture from the morning where the color is more noticeable.

Painting paraphernalia 

Late afternoon pictures






Tomorrow, we'll cut in Swiss Chalet on the upper portions of the tower, inside and out. Then maybe begin the second coat. The long range forecast looks good for painting for another week: highs in the upper 70s and lower 80s with lows in the mid to low 60s.



1 comment:

Thursday

  Walked north on the Pinellas Trail this morning Turned around at the bridge overlooking the sound Curlew Creek bridge on the Pinellas Trai...